FAQ Category: Building Division

  • What is required as to complete a permit Application?

    When applying for a permit, certain information is required to complete the permit Application, including the following:

  • When is an Inspection Required?

    All permits issued require an inspection during and/or at completion of the work. Scheduling inspections is the responsibility of the applicant / contractor. Depending on the type of project, the following inspections are required: Not all of the inspections listed above will apply to every job. If uncertain which inspections pertain, please check with the Building…

  • How Do I Schedule, Reschedule or Cancel an Inspection?

    Schedule, reschedule or cancel an inspection online using eTRAKiT. If assistance is needed, the Community Development Department can be reached at 510-724-8912.

  • When are Inspections Available?

  • How do I Receive Inspection Results?

    Inspection results are available online using eTRAKiT. If assistance is needed, the Community Development Department can be reached at 510-724-8912. As of July 1, 2026 the City no longer offers inspection results by Text Message.