Storm Damage Repair Work

Status: Complete

During the last major storm event several roads were impacted by the heavy rains. The staff have been taking an inventory of the major areas that need to be addressed to preform dig outs of various sections of streets. Dig outs consist of grinding and removing the existing asphalt concrete and placing hot mix asphalt at failed asphalt sections.

Status: Complete
Category: Public Works